Data center interconnection and substation planning
A 300 MW campus needs more than a signed site. It needs a utility that can serve it, a substation plan, and a realistic date for power. GridHub works between data center developers and the utilities that will serve them, so both sides plan from the same numbers.
What utilities need from a data center developer
Get the load request right the first time.
Utilities can’t study a load they don’t understand. GridHub helps developers put together what a utility asks for up front: load ramp schedule, peak demand, power quality and ride-through needs, redundancy, and a realistic in-service date. A complete request gives the utility fewer reasons to send it back with questions.
Load ramp & peak demand profile
Data center power requirements review
Ride-through & power quality requirements
Grid capacity & site screening
Large load interconnection for co-ops and municipal utilities
Serve the new load without putting existing members at risk.
A single campus can ask for more than a small utility’s entire peak. GridHub helps co-ops and municipal utilities review large load requests, set study scope, work through tariff and cost-allocation questions, and plan the substation and transmission upgrades the load will need.
Large load request review
Interconnection study scoping
Large load tariff considerations
Upgrade & cost allocation planning
Data center substation planning
The substation usually sets the schedule.
For most campuses the critical path runs through the substation: equipment lead times, land, and outage windows on the existing system. GridHub reviews substation configuration, redundancy and equipment strategy early, so long-lead transformers and breakers get ordered in time.
Substation configuration & redundancy review
Long-lead equipment strategy
Powered shell & phased energization planning
Grid connection schedule review
Field experience
Planning-stage work on 300 MW to 1 GW campuses.
Josue Sanchez, CPQ, MEM, has worked on the planning stage of large data center projects for major technology providers, with campuses from 300 MW to 1 GW. He spent years inside municipal utilities and more than half his career with major U.S. consulting firms, so he knows how a utility reads a load request.
300 MW to 1 GW campus planning
Developer and utility coordination
Power quality (CPQ certified)
Utility-side review of load requests
Screen. Plan. Coordinate.
Screen: grid capacity and site fit before you commit
Plan: load profile, substation and upgrade plan with the utility
Coordinate: an independent go-between through energization
FAQ
Frequently asked questions
How long does data center interconnection take?
It depends on the utility, the size of the load, and whether transmission upgrades are needed. Substation and transformer lead times are often the longest part. GridHub helps you build a realistic schedule early, before it drives site decisions.
What is a large load interconnection study?
A study the utility runs to see whether its system can serve a new large load and what upgrades are needed. Scope varies by utility, but it usually covers capacity, substation needs and transmission impacts.
Do you work for developers or utilities?
Both, on separate engagements. GridHub advises data center developers on what utilities need, and helps utilities review and plan for large load requests.
Should a data center use behind-the-meter generation?
Sometimes, as a bridge to grid power or for resilience. It changes what the utility needs to plan for. GridHub helps you weigh it against a grid-tied connection from the utility’s point of view.