Lineup of medium-voltage switchgear with protective relays, test switches, and breaker control switches in a substation control building

DISTRIBUTION PLANNING

DISTRIBUTION PLANNING

Distribution planning for co-ops and municipal utilities

Load growth, new large customers and aging feeders all land in the distribution plan. GridHub reviews and scopes planning work from the utility’s side, so the plan reflects how your system actually runs and what your crews can build.

01 / PLANNING STUDIES

01 / PLANNING STUDIES

Distribution planning studies

A second look before the plan goes to the board.

GridHub scopes and reviews load flow and contingency studies, checks the load forecast and assumptions behind them, and turns the results into a list of projects your team can act on.

Distribution network planning

Load flow & contingency analysis

Load forecast review

Planning study scoping

02 / FEEDER PROGRAMS

02 / FEEDER PROGRAMS

Voltage conversion and feeder improvement

Worked out feeder by feeder.

Voltage conversions and feeder rebuilds take years and touch every crew. GridHub helps plan them in stages around outage windows, crew availability and the equipment already in the yard, so each phase stands on its own.

Voltage conversion planning

Feeder improvement programs

Phasing & outage-window planning

New large customer service planning

03 / RESILIENCE

03 / RESILIENCE

Storm hardening and grid resilience

Spend where the next storm will hit hardest.

Storm hardening plans work best when they follow outage history and asset condition, not a blanket standard. GridHub helps utilities rank hardening projects and draws on Josue’s oversight of a 67-project, FEMA-funded substation recovery program.

Storm hardening plans

Grid resilience prioritization

Post-storm recovery planning

FEMA-funded program experience

04 / POWER QUALITY

04 / POWER QUALITY

Power quality testing and analysis

From a Certified Power Quality Professional (CPQ).

Flicker, harmonics and voltage sags show up as customer complaints long before anyone finds the cause. Josue Sanchez, CPQ, MEM, investigates power quality issues against IEEE 519 and IEEE 1159 and recommends fixes that work for both the utility and the customer.

Power quality investigations

Harmonics review (IEEE 519)

Voltage sag & flicker analysis

Data center power quality

Line worker in a bucket truck silhouetted against a stormy sky on a distribution pole
Line worker in a bucket truck silhouetted against a stormy sky on a distribution pole
Line worker in a bucket truck silhouetted against a stormy sky on a distribution pole

HOW AN ENGAGEMENT WORKS

HOW AN ENGAGEMENT WORKS

Review. Recommend. Support.

Review: studies, load forecasts and outage data

Recommend: ranked projects with the reasoning written down

Support: follow-up reviews as projects move to the field

FAQ

Frequently asked questions

Do you run planning studies or review them?

Mostly review and scope. GridHub checks studies prepared by your staff or an engineering firm, and can scope new work when it’s needed.

Does GridHub provide stamped engineering?

No. GridHub is an independent advisory practice. When a project needs stamped design, GridHub helps you scope it and reviews the engineering firm’s work.

What does a power quality investigation involve?

Reviewing complaints and system data, setting up monitoring where needed, and comparing results against standards like IEEE 519 and IEEE 1159. The result is a likely cause and a recommended fix.

Can you help after a major storm?

Yes. GridHub helps with recovery planning and with ranking hardening work afterward, drawing on a 67-project, FEMA-funded substation recovery program.

A clearer view of the evolving grid.

A clearer view of the evolving grid.

Independent perspectives on energy, engineering, and what comes next.

Independent perspectives on energy, engineering, and what comes next.

GridHub logo

Independent expertise. A stronger, more resilient grid.

© 2026 GridHub, LLC. All rights reserved.